Research

AllStation Originals

Quantitative Analyses
Transport electrification emissions chart

February 2026  ·  Energy & Transport

If India 100% Electrifies Its Transport Network, What Is The Net Change in Carbon Emissions?

Modeling transport electrification impact as a function of grid carbon intensity.

Key Finding

At India's current 75% coal grid, full electrification reduces national emissions by ~6%; with a fully clean grid, reduction reaches 13%.

Read Full Analysis
India renewable capacity trajectory graph

February 2026  ·  Energy

India's Clean Electricity Trajectory: Will the 500 GW Target Be Met by 2030?

Time-series regression analysis of India's renewable capacity growth and generation outcomes.

Key Finding

India will reach 500 GW by 2033 (3 years late). Generation share lags significantly behind capacity due to intermittency.

Read Full Analysis
Mumbai Coastal Road induced demand graph

March 2026  ·  Urban Systems

The Mumbai Coastal Road Project: Examining Induced Demand of Traffic

Elasticity-based modeling of induced demand and congestion equilibrium.

Key Finding

Induced demand erodes MCRP's promised 67% travel time reduction to 42–58% within a decade.

Read Full Analysis
Renewable MCDA Results Table

May 2026  ·  Energy

Nuclear, Hydro, or Solar? A Multi-Criterion Decision Analysis of India's Clean Electricity Triarchy

AHP-WSM based MCDA of India’s clean electricity technologies.

Key Finding

Nuclear ranks highest across most MCDA scenarios due to superior reliability and low lifecycle emissions; hydro overtakes only in cost-first conditions.

Read Full Analysis
HSR Carbon Payback Results Table

May 2026  ·  Transport

Nothing is Certain but Death and Taxes: The Conditional Sustainability of Indian High-Speed Railway

Carbon modelling of India's newly proposed HSR corridors under dynamic grid decarbonisation and modal shift sensitivity analysis.

Key Finding

Five of seven corridors achieve carbon payback within 15 years; sustainability is conditional on grid decarbonisation and modal shift, not guaranteed by technology alone.

Read Full Analysis
White Cities albedo model results

June 2026  ·  Urban Systems

You Can't Handle the Heat: Bounding the White Cities Concept in Ahmedabad

Radiative modelling of urban albedo intervention bounds using a 0D equilibrium model and atmospheric literature.

Key Finding

The white cities concept yields at most 5.87°C cooling under ideal radiative conditions, but atmospheric dampening reduces real-world benefits to ~0.47°C — a 92% attenuation. Dedicated deployment is insufficient to curb the UHIE alone.

Read Full Analysis
Pune Metro carbon payback ridership S-curve

July 2026  ·  Urban Systems & Transport

Good Things Come to Those Who Wait: A Carbon Payback Analysis of the Pune Metro Project

Piecewise logistic ridership modelling and carbon debt accounting for Pune's 66km metro network, with modal shift sensitivity analysis.

Key Finding

The Pune Metro reaches carbon neutrality in the 2030–2037 window. Modal shift and private-vehicle emissions are decisive variables; ridership volume and vehicle split within modal shift are not.

Read Full Analysis
🔭

Next Original — Coming Soon

A new analysis is in progress. ASL projects are published when the math has been tested and findings are clearly stated. Unfortunately this is a time-consuming process.

Academic Writing

Coursework & Assignments

FLAME University

Selected pieces from FLAME University coursework, edited and presented as individual articles.

Policy-Based Remedies for Environmental Impacts of the International Container Transshipment Port, Great Nicobar

Explores the environmental impacts of the ICTP, evaluates multiple environmental policies that can mitigate these impacts. Paper settles on environmental performance bonds, adaptive management mandates, open-data platforms, and community-based environmental monitoring as strong policy remedies for mitigation.

Read Article

Enforcement & Practicality: A Response Paper to International Principles for Best Practice EIA Follow-Up, By Marshall, Arts, and Morrison-Saunders (2012)

Summarises, examines, and responds to Marshall, Arts, and Morrison-Saunders (2012). Extension of the paper to bridge principles with reality by including societal situations, contexts, and execution methods of EIA is required.

Read Article

Sealing the Cracks: Methods for Combating EIA’s Major Problems.

India's EIA procedure suffers from corruption, public involvement concerns, and poor quality. EIA must be legislatively reinforced and practically supported through independent evaluations, strengthening of quality checks, and enforcement of accessible, transparent public involvement with opportunities for opposition.

Read Article

Environmental & Social Effects of Mumbai Metro Line 3

Mumbai Metro Line 3 has several severe socio-environmental effects on the urban environment. However, the metro remains a good investment for the public, but mitigation and management measures should be carefully followed, without spare of expenses.

Read Article

From A to B: Optimising Pune City’s Public Transport with AI-Based Systems For Sustainability and Environmental Benefits

Pune's PMPML public bus system suffers from a litany of problems. A technical revamp of the entire system in the form of PMPML 2.0 would inter-agency collaboration, accountability, policy alignment and maintenance of funding.

Read Article

Pune’s PT Does Not Need to be Improved. It Needs to be Scrapped & Rebuilt Entirely.

Pune's public transit posseses many systemic failures. Rather than incremental progress, a full demolition and reconstruction is in order for proper functioning.

Read Article

Climate Change Consolidated: A Manual of Everything Regarding Climate Change, In A Certain Degree of Detail

This manual aims to comprehensively discuss the topic of climate change. By studying the various spheres of Earth, alongside a case study, this handbook aims to explain climate change, its effects, and consequences. Possible solutions are also briefly explored.

Read Article